Resource estimate · Effective 19 January 2026

The Tower Mountain mineral resource estimate was prepared by Micon International Limited for Thunder Gold Corp. and reports about 3.5 million ounces of contained gold. This page sets out the tonnages, grades and categories, the assumptions underneath them, and what the estimate does not claim.

3.5 Moz
contained gold, Indicated and Inferred
0.19 g/t
cut-off grade applied to the estimate
245.1 Mt
total tonnage at about 0.45 g/t Au
01

What the Mineral Resource Estimate Reports

Two categories of mineral resource are reported from a pit-constrained open-pit model. The Indicated category contains 34.0 Mt at 0.46 g/t Au for 514,000 ounces. The Inferred category contains 211.1 Mt at 0.45 g/t Au for 3,053,000 ounces. Together that is 245.1 Mt at approximately 0.45 g/t Au, or roughly 3.5 Moz of contained gold.

The estimate is effective January 19, 2026 and was filed as an NI 43-101 technical report on March 10, 2026. The modelled extent covers about 1,800 m by 500 m along the western contact of the Tower Mountain Intrusive Complex. Reported figures are rounded and may not sum exactly.

Sampled drill core from the Tower Mountain gold project that supports the mineral resource estimate for the property in Ontario
02

Indicated, Inferred and the Missing Measured Category

NI 43-101 categories describe the confidence placed in a mineral resource estimate rather than the value of the rock in the ground. Indicated resources are estimated with sufficient confidence for modifying factors to be applied in a pre-feasibility study. Inferred resources are based on limited sampling and are considered too speculative for economic considerations to be applied to them.

No Measured resources are reported at Tower Mountain. Inferred tonnage dwarfs the Indicated category for one reason: drilling density. Project to date, 235 holes and roughly 47,000 metres have tested the deposit, and most of that work sits along one contact of the intrusive complex. Moving tonnes from Inferred to Indicated takes closer-spaced drilling, which is what the current definition programme is designed to deliver.

A Measured category requires the highest level of confidence, with drill spacing tight enough and data verified closely enough that little judgement remains about grade and continuity. At Tower Mountain the work has not yet reached that spacing, so no mineral resource estimate has ever reported Measured material.

03

The Assumptions Behind the Numbers

A mineral resource estimate is only as useful as the assumptions beneath it. The filed parameters use a 0.19 g/t Au cut-off, a specific gravity of 2.77 and a gold price of US$3,000 per ounce. Mining is costed at US$3.0 per tonne, processing at US$8.0, G&A at US$3.5 and transport at US$2.5 per ounce, with a 3 percent royalty and pit slopes of 30 degrees in overburden and 50 degrees in fresh rock.

The pit model assumes 80 percent metallurgical recovery, while testwork on 16 representative samples returned 68 to 94.9 percent and averaged about 85 percent. A higher gold price or a lower cut-off would generally add tonnes and ounces; a lower price would remove them, which is why a mineral resource estimate is revisited as drilling, metallurgy and markets move.

Strip ratio is modelled at 1.8:1 waste to ore, and the Company reports a discovery cost to date of C$3.95 per ounce.

04

Who Prepared the Estimate

Micon International Limited, an independent consulting firm, prepared the mineral resource estimate. The Qualified Persons are William Lewis, P.Geo.; Charley Murahwi, P.Geo., FAusIMM; and Tudorel Ciuculescu, P.Geo. Under NI 43-101 the QPs take professional responsibility for the technical content, including the assay database, the geological and domaining model, the grade estimation method and the classification.

The report covers the property setting, drilling and sampling procedures, data verification, metallurgical testing and the sensitivity analysis. It is filed under the Company profile on SEDAR+ and linked from the technical report page.

05

What the Estimate Does Not Claim

Mineral resources are not mineral reserves and do not have demonstrated economic viability. This mineral resource estimate is not a mine plan, not a feasibility study and not a production forecast. Thunder Gold is a junior exploration company that generates no revenue from the property, and material can only become a reserve once a study demonstrates that it can be mined economically.

06

What Happens Next

The Company has outlined a 15,000 to 25,000 metre infill and expansion programme for 2026 and is targeting an updated mineral resource estimate in the fourth quarter of 2026, with 1.5 Moz Indicated and 3.5 Moz Inferred as the stated objective. An initial Preliminary Economic Assessment is targeted for late 2026 or early 2027, with pre-feasibility work beyond that.

Because the programme is funded and results are released as assays arrive, the mineral resource estimate can be refreshed materially within a single field season. The growth case is set out on the resource expansion page.

Questions

Frequently Asked Questions

34.0 Mt Indicated at 0.46 g/t Au for 514,000 ounces and 211.1 Mt Inferred at 0.45 g/t Au for 3,053,000 ounces, about 3.5 Moz in total, with no Measured resources.

Because of drilling density. Inferred material sits where holes are further apart. Converting it to Indicated requires closer-spaced drilling, which is the purpose of the 2026 infill programme.

0.19 g/t Au, with a specific gravity of 2.77, a US$3,000 per ounce gold price and an open-pit optimisation using 30 degree slopes in overburden and 50 degrees in fresh rock.

No. Mineral resources are not mineral reserves and do not have demonstrated economic viability. A reserve requires a study showing the material can be mined economically, and no such study has been completed at Tower Mountain.

The Company is targeting an updated estimate in the fourth quarter of 2026, with 1.5 Moz Indicated and 3.5 Moz Inferred as the stated objective, followed by an initial PEA targeted for late 2026 or early 2027.

Read the full technical report