Location - Low Strip Ratio - Real Economics

Gold Ounces

3.5 Moz

Already Defined
3.0 Moz Inferred & 0.5 Moz Indicated
C$3.95/oz Discover Cost
Targeting 5 Moz by YE 2026

infrastructure

40 km

From Thunder Bay
Highway, Rail & Power within 3km
International Port
No Camp or Roads Required

upside

1.8:1

Peer-Leading Strip Ratio
Only 20% of System Drilled
IRGD Generational Potential
Consistent Gold Mineralization

Location & Low Waste Mining Drive Real Project Economics — Not Grade Alone

Tower Mountain's low strip ratio is best-in-class.
Strip-adjusted grade sits above the peer group average.
STRIP RATIO
(Waste:Ore)​​
Lower is better!
Tower Mountain
1.8:1
Spanish Mountin
2.0:1
Springpole
3.0:1
Troilus
3.1:1
Moss Lake
5.3:1
Fenn-GIB
6.0:1
Novador
7.4:1
STRIP ADJUSTED GRADE
(g/t Au)
 
Fenn-GIB
0.104
Spanish Mountin
0.146
Troilus
0.155
Tower Mountain
0.161
Moss Lake
0.161
Novador
0.174
Springpole
0.185
Source: Atrium Research

Near-Term Value Catalysts for Thunder Gold

2026

15–25,000 m
Definition & Expansion

Q4 2026

Updated MRE
Target 1.5 Moz Indicated & 3.5 Moz Inferred

Q4 2026 / Q1 2027

Initial PEA
First Economic Study

2027+

Pre-Feasibility
Path to Development

Thunder Gold’s 3.5 million ounce gold deposit is yet to be reflected in its market valuation.

Join Our Mailing List


By submitting this form, you are consenting to receive marketing emails from: . You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact